Solar permits, the 150 kW threshold and incentives
Below 150 kW: no generation licence. Above 150 kW: licensing under the Law “On licenses and permits.” No distinct solar-installer licence regime was found — work runs under construction/urban-planning norms and the electrical-installation rules.
When is a permit/licence needed?
Generation up to 150 kW needs no permit or licence. Generation above 150 kW falls under the Law “On licenses and permits”; large producers are selected by auction or direct negotiation.
150 kW or 200 kW? (clarification)
Use 150 kW as the reliable prosumer / no-licence line. The 200 kW figure appears in some Cabinet documents and in an operation-permit context for electrical installations (reported effective 01.01.2024) — this is not the same as the 150 kW active-consumer / generation-licence cap. Do not conflate them.
Tax incentives (from January 2025)
For green-generation projects, the 2025 Tax Code changes provide exemption from profit, property and land tax, plus VAT/customs relief on imported equipment. The duration is reported as 5 years by some sources and 7 years by others — this discrepancy needs confirmation.
Household prosumer tax and installer licence
A household active consumer’s surplus income (≤150 kW) is tax-free. No separate installer licence/certification requirement was identified — but absence of evidence is not evidence of absence.
Frequently asked questions
Do I need a licence for a solar system?
Generation up to 150 kW needs no licence; above that it falls under licensing.
Is the threshold 150 kW or 200 kW?
The reliable prosumer / no-licence figure is 150 kW; 200 kW is a separate operation-permit/connection threshold still to be confirmed.
How many years is the tax break?
Sources differ between 5 and 7 years — check the current Tax Code before relying on it.
Sources & last updated
Last updated: 2026-11-26
- <150 kW: no licence — AREA (trend.az) (25.06.2025, In force)
- 150 kW vs 200 kW — different contexts — azernews.az; Cabinet documents (nk.gov.az) (2024, Needs confirmation)
- Green-project tax incentives (5/7-year duration) — Bloomberg Tax; KPMG; PwC (Mar 2025, Needs confirmation)
- Household prosumer surplus tax-free — EU4Energy presentation (Nov 2025, In force)
Note
This page is general information, not legal advice. Official figures (tariffs, thresholds, fees) can change — verify against the official sources below, or with Azərişıq / ASAN Kommunal, before making a decision.